Development Basics

What Is Acceptance Criteria in Software Projects?

What Is Acceptance Criteria in Software Projects?

Every backlog item eventually gets a yes or a no from the product owner. Acceptance criteria are what that decision rests on, a list of testable pass/fail conditions written on a single user story, task or epic.

Developers build to the list and testers verify against it. The product owner closes the item only when every line passes.

Requirements problems get expensive at scale. PMI’s 2014 Pulse of the Profession study found that 47 percent of unsuccessful projects missed their goals because of inaccurate requirements management. Item-level conditions are the narrowest layer of that work, which is also why they’re the easiest to check: a tester can read each line and say whether it holds.

What Are Acceptance Criteria?

YouTube player

A single backlog item carries its own list of testable pass/fail conditions, and the product owner accepts the item only if every one of them holds. That list is the acceptance criteria.

It doubles as a scope line around the story, task or epic. Anything the list leaves out was never promised.

A behavior that isn’t on the list counts as a new request, not something that slips in quietly mid-sprint. Product owner, developers and testers all work from the same wording, and each line hands a tester one thing to check.

Every set of criteria sits on an item in the product backlog. The Scrum Alliance glossary describes them as clear, concise conditions that work like a pass/fail checklist, usually developed during refinement or sprint planning.

Oddly, the 2020 Scrum Guide (Schwaber and Sutherland) never uses the term, even though the Scrum framework builds on the Definition of Done. The term comes from user story practice, which Scrum teams adopt on top of the framework.

Mike Cohn of Mountain Goat Software likes the name conditions of satisfaction better, since product owners grasp it more readily, though he treats the two terms as near equivalents.

How Acceptance Criteria Connect to User Stories and Acceptance Tests

YouTube player

A story tells you what the user wants. The criteria are how the team shows it was actually delivered.

Here’s the story the rest of this article reuses. “As a billing admin, I want to download the invoice list as a CSV file, so that I can reconcile payments in a spreadsheet.”

Under that story, a team might write these:

  • A Download CSV button appears on the invoice list for billing admins only
  • The file holds every invoice that matches the active filters
  • The header row lists invoice number, customer, issue date, amount and status
  • An empty list produces a file with the header row and nothing else

Below the criteria sit a couple more layers. A criterion is one condition that either passes or fails. The acceptance test is the check that proves it, run by hand or automated, and the test case holds the steps and data behind that check.

Microsoft’s Azure Boards documentation (as of November 2026) tells teams to describe the criteria before work begins and to use them as the basis for acceptance tests. Under its default user story workflow, a story closes once the product owner agrees the work meets the criteria and the acceptance tests pass.

Automating the acceptance tests pays off more than once, because the same checks can run as regression testing in later sprints.

In acceptance test-driven development, the team writes those tests before the code, so each criterion has an automated check from day one. A requirements traceability matrix then lists every criterion beside its test and exposes any criterion that has none.

Which Acceptance Criteria Format Should a Team Use?

A plain checklist covers validation rules and simple behavior just fine. Given/When/Then earns its extra words on multi-step user flows, and when one story needs both, a hybrid does the job.

FormatStructureBest fitLimit
Given/When/ThenContext, action, outcomeMulti-step user flowsGets wordy fast
Rule checklistShort pass/fail statementsValidation, permissions, field listsHides step order
Hybrid or customChecklist plus one scenarioRules with one risky pathNeeds a team convention

Scenario-oriented criteria with Given/When/Then

Each scenario describes one behavior as a context, an action and an outcome. The format comes out of behavior-driven development, and Gherkin is the syntax that tools such as Cucumber read.

Gherkin’s primary keywords are Feature, Rule, Example (or Scenario) and the steps Given, When, Then, And and But. Rule has been part of the language since Gherkin 6, per the Cucumber reference.

For the CSV story, one scenario reads like this:

  • Given I am a billing admin viewing invoices filtered to Unpaid
  • When I click Download CSV
  • Then the file contains only unpaid invoices

The same reference warns that scenarios with too many steps lose their value as a specification. It also notes that every example doubles as a test.

Rule-oriented checklist criteria

When the conditions are really just rules, a checklist is the better pick.

Each line states one rule the finished item either meets or fails. That suits validation rules and permissions, and anything that boils down to a field list. A second story, filtering invoices by status, shows it:

  • Filter options are Paid, Unpaid and Overdue
  • Selecting an option updates the list without a page reload
  • Clearing the filter restores the full list

The catch is that a checklist says nothing about the order of steps, so an interaction with state changes needs a scenario.

A decision rule for choosing the format

Scenarios are for stories where the user moves through several screens or states, and a checklist is enough when the conditions are independent rules or field lists. Stories with both get a checklist for the rules plus one scenario for the riskiest path.

Stick to one style per story. Once a card has three styles on it, nobody can read the criteria anymore.

Who Writes Acceptance Criteria, and When?

The product owner owns the criteria. Developers and testers pressure-test them, and the wording gets locked before development starts.

Who contributes

The 2020 Scrum Guide makes the Product Owner accountable for creating and clearly communicating Product Backlog items. The product owner may delegate the drafting to a business analyst, but the accountability stays put.

In practice the product owner states the business outcome and the conditions that prove it. Developers flag technical limits and wording that’s unclear, while testers ask the what-if questions and add edge cases.

Put those three in a room and you have a Three Amigos session. Cucumber’s guidance puts the minimum at three people, suggests 3 to 6 as the rule of thumb, and budgets about 25 to 30 minutes per story.

When criteria are drafted and finalized

Sources disagree on timing, though less than it first seems.

The Scrum Alliance glossary places drafting in backlog refinement or sprint planning. Azure Boards documentation says to describe the criteria before work begins.

Cucumber’s discovery workshop guide goes the other way and says to hold the conversation as late as possible, so new details still fit.

What works in practice is to draft in refinement, test the draft in a Three Amigos conversation, and lock it before the story is pulled in. A story without agreed criteria stays out of sprint planning, because developers cannot plan work they cannot test.

Change stays possible. The Scrum Guide allows scope to be clarified and renegotiated with the Product Owner during a Sprint, so a changed criterion goes through the product owner and gets recorded on the item.

How to Write Acceptance Criteria Step by Step

Work from the story’s value first, then the happy path, then the things that can go wrong. Every line should read as an observable pass or fail with no implementation detail in it, and a developer and a tester should see the draft before the story reaches a sprint.

The invoice export story, worked through:

  1. Restate the value. The admin reconciles payments in a spreadsheet, so the file has to open cleanly there.
  2. List the happy path, which here is a billing admin downloading the filtered invoice list.
  3. Add the negative and edge cases, such as a user without the role or an empty list, plus a customer name that contains a comma.
  4. Word each line as a pass or fail. “A customer name containing a comma stays in one column” beats “special characters are handled”.
  5. Strip implementation detail. Class names and endpoints don’t belong, and neither does the file-generation method.
  6. Review with the team. Developers check feasibility and testers hunt for gaps.

A software tester is the person most likely to raise the comma case, which is why that last review matters.

What good acceptance criteria look like

A good line is testable, meaning someone who did not write it can check it and get a pass or fail. It’s also clear and concise, with one condition per line in plain words.

When a limit matters, write it as a number with its unit. And keep the line implementation-neutral: name the behavior and leave the how to the developers.

Bill Wake coined the INVEST checklist in 2003, and its T stands for testable. Martin Fowler glosses it as being able to write tests that verify the story works, which is exactly the job criteria do.

Cucumber’s documentation makes the neutrality point for scenarios. Describe intended behavior and avoid steps like clicking a button, because they tie the scenario to the current UI.

Atlassian’s guide asks for plain, unambiguous language that engineering, QA, design and product all read the same way.

Acceptance Criteria vs Definition of Done

Acceptance criteria are tied to one backlog item and describe what it must do. The Definition of Done covers the whole Increment, and every item has to clear the quality bar it sets.

AttributeAcceptance criteriaDefinition of Done
ScopeOne backlog itemEvery item, the whole Increment
OwnerProduct owner, refined with the teamThe Scrum Team, kept by the Developers
Set whenPer item, before work startsOnce, reviewed at each retrospective
Question answeredDid we build the right thing?Did we build it to standard?
ExampleHeader row lists five named columnsCode reviewed, tests passing

The 2020 Scrum Guide describes the Definition of Done as a formal description of the state of the product increment once it meets the quality measures the product requires. The Scrum Team inspects it at every Sprint Retrospective.

A backlog item that misses it cannot be released or shown at the sprint review. Passing every acceptance criterion does not change that.

Sources disagree on how the two relate.

Scrum.org treats them as separate layers. The Definition of Done is required and cannot be negotiated down, while acceptance criteria are an optional practice that can be renegotiated during the Sprint. An Increment can exist without every criterion met if the Definition of Done holds.

Mountain Goat Software stacks them instead. There the Definition of Done works as a set of criteria added to every story, and an item is done only when both its own criteria and the Definition of Done are met.

Both agree on where content goes. Item-specific behavior sits in the criteria, and standing standards sit in the Definition of Done.

One practical option is to put “all acceptance criteria met” as the first line of the Definition of Done, as Mountain Goat Software’s sample Definition of Done does. The board then shows one gate instead of two. Scrum.org warns against it, though, since criteria inside the Definition of Done can no longer be renegotiated during the Sprint.

Where Acceptance Criteria Fail

The same few problems keep showing up. Criteria get written vaguely or too prescriptively, a story collects too many of them, they appear only after coding has started, or team-wide standards get pasted into every story.

Common writing mistakes and their fixes

  • Vague or prescriptive wording gets fixed by swapping the adjective for an observable result and naming the behavior instead of the class or endpoint.
  • When a story piles up criteria, split it. Mountain Goat Software advises splitting when the criteria would make a story too big for an iteration or deserve different priorities.
  • Criteria written after coding starts describe what was built, not what was asked.
  • Standards pasted into every story belong in the Definition of Done.

Two rewrites from the invoice story show the pattern.

The vague version reads “The CSV export works correctly.” Rewritten, it becomes “Every invoice matching the active filters becomes one row, and a customer name containing a comma stays in one column.”

The prescriptive one, “Use the ExportService class and the /api/invoices/csv endpoint,” turns into “A billing admin can download the filtered list as a CSV file.”

Work items that do not fit acceptance criteria

Not every backlog item has user-visible behavior to accept.

A research spike produces a finding or a decision, so its criterion names the question to answer and the time box. A technical task with no user-facing change states a verifiable end state, such as a finished migration with matching row counts. An epic is too large to test as one unit, so the testable criteria belong on the stories it splits into.

Quality targets need a placement rule. Where a target lives depends on whether it is a functional or non-functional requirement.

Scaled Agile Framework documentation (as of November 2026) calls non-functional requirements persistent qualities, typically revisited through the Definition of Done each iteration, Program Increment or release. It also gives an example of a constraint written into the acceptance criteria of every new backlog item that needs it.

A quality target that applies to one item becomes a measurable criterion on that item. One that applies to every item, such as an accessibility standard, goes into the Definition of Done.

Acceptance Criteria FAQ

Are acceptance criteria the same as requirements?

No. Requirements state broader project needs, while acceptance criteria turn one need into specific conditions on a single backlog item. A software requirement specification holds the needs, and the criteria sit on the items that deliver them.

What is the difference between acceptance criteria and user acceptance testing?

The criteria are the written conditions. User acceptance testing is the activity where business users check the delivered software against those conditions and decide whether to accept it.

Is a Definition of Ready the same as acceptance criteria?

No. A Definition of Ready is a team checklist for when an item is clear enough to start, and agreed criteria are often one line on it. The Scrum Guide defines the Definition of Done but has no Definition of Ready.

How many acceptance criteria should a story have?

No source sets a fixed count. The number follows the story’s size, and a list that keeps growing means the story needs splitting. Each line should still check one thing.

Do bug reports need acceptance criteria?

Yes. Azure Boards documentation asks teams to define the criteria for a bug or user story before it can close. For a bug, they state the corrected behavior and that nearby behavior still works.

Where do teams store acceptance criteria in Jira or Azure DevOps?

Azure Boards has a dedicated Acceptance Criteria field on user stories and bugs. Jira teams commonly write them in the description or add a custom field, so each item keeps its conditions beside the work.

When a Passing Story Still Gets Rejected

A story that meets every acceptance criterion and still fails stakeholder sign-off exposes a missing condition, not a build defect. The fix starts by writing the missed behavior down as a new criterion.

Record the missed behavior first. Then decide with the product owner whether it’s a fix or new scope, and add the case as a regression test.

Recording comes first so the argument stays factual. Deciding scope second keeps a fix from turning into quiet scope creep.

A behavior that adds scope goes through change request management as a new item, and the accepted story stays closed.

The cost is that the story reopens and the release date moves. In exchange, the next similar story starts with a criterion that already covers the case.

Verified November 2026. A revised Scrum Guide that defines acceptance criteria would change who owns the new line.

Bogdan Sandu

Stay sharp. Ship better code.

Every week: one curated article, one tool worth knowing, one tip you can use tomorrow. No noise, no padding.